Vendor | : | Oracle |
Exam Code | : | 1Z0-1002 |
Exam Name | : | Oracle Manufacturing Cloud 2018 Implementation Essentials |
Questions and Answers | : | 66 Q & A |
Updated On | : | Click to Check Update |
PDF Download Mirror | : | 1Z0-1002 Brain Dump |
Get Full Version | : | Pass4sure 1Z0-1002 Full Version |
Your Customer has implemented Oracle Cloud Manufacturing and the Manufacturing user is in the process of defining Work Definition and Operations. However, this user is unable to assign an ad hoc item, Grease, to an operation. Identify the reason.
The user doesn’t have Override Item Structure Components in the Work Definition privileges.
An item cannot be assigned on an ad hoc basis.
The user doesn’t have access to the PIM module.
The user doesn’t have Data access to create item structure.
In a Manufacturing Cloud post production support environment, a user wants to update some of the operations in the work orders by using the Midpoint Scheduling feature. However, the user is unable to update any of the orders.
Identify two reasons.
The work order operations do not have operations start or completion date.
The scheduled resources are not part of the organization selected by the user.
None of the operations include scheduled resources.
The operations are missing sequence.
Identify the three changes that are allowed to be made to active Work Definition in a Work Center, without creating a new version.
Delete an Operation
Costing Priority
Production Priority
Add an Operation
Completion Subinventory
Your customer has multiple distribution centers and a few manufacturing plants. Plants make different items with some overlap between them in terms of products manufactured. The distribution centers stock parts from all plants. A Corporate Engineering team is responsible for centrally defining items and catalogues. This team defines the items and sets the attributes for most parameters. The respective distribution centers and manufacturing plants are allowed to change some attributes locally. Identify two different ways of achieving this requirement.
Set up Plants as Inventory Organizations, Distribution Centers as Item Organizations, and Corporate Engineering organization as Inventory Organization.
Set up Plants as Inventory Organizations, Distribution Centers as Inventory Organizations, and Corporate Engineering organizations as Item Organization.
Set up Plants and Distribution Centers as Inventory organizations and Corporate Engineering organization as Item Organization
Set up Plants and Distribution Centers as Inventory organizations and Corporate Engineering organization as Inventory Organization.
Set up Plants as Inventory Organizations, Distribution Centers as Item Organizations, and Corporate Engineering organization as Item Organization.
Your customer is a light assembly manufacturing company that doesn’t require shop floor control. A manufacturing engineer wants to generate a work definition automatically for some items, and wants to eliminate the explicit maintenance of work definitions. Which three steps must be completed and verified in the Work Definition area?
Ensure the predefined work definition name ORA_MAIN name is active.
Select a resource that is to be used in automatic work definition by enabling the attribute Default for automatic work definition.
Select a standard operation that is to be used in automatic work definition by enabling the attribute Default for automatic work definition.
Ensure the item is a standard item with a secondary item structure.
Ensure there is only one default standard operation at a given point in time.
As a production supervisor, you require immediate access to critical shop floor execution systems to take action while on the go. Which four work order related actions can be taken in the Manufacturing Supervisor mobile application?
Executing standard work order and updating item and resource usage
Creating a new standard or non standard work order
Searching for work orders and sending them through e-mail
Releasing work orders using quick swipe details
Reviewing operation, component, and resource detail
Reviewing customer information of work orders
Your customer has the following business requirement. There are two work definitions created in the application. One Work Definition for Engine Finished Good and other Work Definition for Pallet Finished Good. The Engine Finished Good item should have Pallet Finished Goods as one of its component. Identify the way to establish the relationship between Pallet and Engine Work Definitions.
Create a Subinventory that could be the completion Subinventory for yielding the pallet and then the same Subinventory can serve as the supply Subinventory of the pallet in the Work Definition created for Engine.
Assign a higher priority to the Work Definition created for Engine and a lower one for the Work Definition for Pallet.
The two Work Definitions can be tied through Project or Seiban numbers.
The Work Definition versions can be used to tie the Work Orders.
In a manufacturing plant, a production operator in a given shift completes a car assembly and reports this using orderless completion by referencing a Work Definition. Identify the two purposes of the referenced Work Definition in Orderless reporting.
Material usage
Resource usage
Processing steps
Scrap material
Return material
A manufacturing cloud user wants to print information available in the work order in PDF. Identify the three reports that the user can print directly from the work order screen using the Print PDF action.
Work Order Traveler
Resource List
Print Labels
Print Component List
Bill of material